4 Comments

  1. Sorry for the phone pic of the screen. Our new machine is not connected to our network and I have no idea how to save pics yet.

  2. That’s why you do a netlist test.

  3. Does the incomplete trace exist because the trace wasn’t routed in the EDA program, or because the trace physically broke off?

  4. Is this a one off, or do all the PCBs have the same issue. Is this your design or are you the customer, this goes back to checking the design? Last quick one, if this is your board, quick turn or production board house, and did they do an electrical verification test on it?

Leave a Reply

Your email address will not be published. Required fields are marked *

SHOPPING CART

close